Monday, June 28, 2010

The Work Begins

Kevin (my husband) and I pulled up the industrial carpeting in the studio yesterday.  We've picked out flooring, so we just need to prepare the area for installation.  Other than mistakenly receiving the bank's electric bill (causing a little bit of stress until we figured out the meters were switched), things have been smooth so far.  With the carpet out of there, the studio is looking like it's on its way to being a studio rather than an office.  Pretty soon . . .

Monday, June 21, 2010

First Post!

Hi Yogis!  Here's the place from the outside.
The address is 105 Mill Plain Rd, above the Webster Bank.  We are two doors down from the Trader Joe's / Starbucks Plaza off I-84 Exit 2 in Danbury, Connecticut.  Right now we are getting the place in shape and hoping to open sometime in August.  There is some work to do and we're not sure how long it'll take to do it.  Stay posted, follow the blog and send us your email address so we can update you on progress and an opening date.  More pictures to follow.  Talk to you soon!